Unplasticised PVC Pipes for Industrial Use
In stock
Reconfirm the price with seller
- Customer pickup,
- Courier
- In detail
Description
Assembly of Socketted Pipes with Solvent Cement Joints
Making the Joint
- While the surface is still wet, push the spigot home into the socket with a slight twisting motion.
- Hold for 30 seconds without movement.
- Remove excess cement with a soft cloth.
- The pipe may be handled, but not unduly stained for 1 hour.
- Wait 24 hours before putting to use.
Solvent Cement
- High Viscosity, Slow Drying - Recommended for pipes above 155mm in diameter.
- High Viscosuty, Quick Drying - Recommended for pipes below 155mm in diameter.
Making the Joint
- While the surface is still wet, push the spigot home into the socket with a slight twisting motion.
- Hold for 30 seconds without movement.
- Remove excess cement with a soft cloth.
- The pipe may be handled, but not unduly stained for 1 hour.
- Wait 24 hours before putting to use.
Solvent Cement
- High Viscosity, Slow Drying - Recommended for pipes above 155mm in diameter.
- High Viscosuty, Quick Drying - Recommended for pipes below 155mm in diameter.
Contact the seller
Unplasticised PVC Pipes for Industrial Use
We recommend to see